Home/Permitting
Health permitting

You file the permit.
We draw the plans.

You collect what your county requires. We draw the plans. The build starts after you are approved.

6 steps · drawings $300

You file the permit. We draw the plans.

Skip the county packet and we cannot schedule the consult.

PriceDrawings $300. The build is priced after approval.
TimeCounty approval is weeks to months. Custom Elite is 12–16 weeks from the deposit.
Start the permitting inquiry
  1. Tell us about the project
  2. Gather your county's requirements
  3. The permitting consult
  4. Schematics and plumbing diagrams
  5. You submit to your county
  6. Approved? Let's build

Your county decides.

Health-permitted builds follow a different path than our standard orders. The permitting process involves your county health department. We provide the schematics and build expertise, but the application and approval process is between you and your county.

That distinction matters more than anything else on this page. Requirements vary by county, and the only office that can tell you what yours are is your local health department. Sink counts, countertop material, NSF certifications, hookup specs: all of it is set by them, not by us. We build to what they tell you.

So the first real step is a phone call or a form on a county website, not an order. Once you have their answers in hand, we can design to them. Until then, anything we drew would be a guess, and a guess is the expensive kind of mistake here.

Plumbing is usually where the county requirements land hardest. Sink options, water tanks, pumps, and NSF-certified rinsers are covered on the plumbing page. Custom tank sizes and layouts for permitted builds are available — tell us during quoting.

How it works

Six steps, in order.

i.

Tell us about the project.

Fill out the permitting inquiry form at the bottom of this page. It takes about five minutes and tells us where you are in the process.

You do not need to have all the answers yet. The form is how we find out what you already know and what you still have to go get.

ii.

Gather your county's requirements.

Before your consult, contact your county health department and collect their specific requirements. This one is not optional. We cannot design to spec without knowing what your county requires.

The list of what to ask for is further down this page.

iii.

The permitting consult.

Once you have gathered your county's requirements, you will be directed to schedule a 30-minute consult. We review everything together — dimensions, sink specs, plumbing layout, NSF requirements — and confirm what we can build for you.

Projects submitted for county approval require this consult before the build begins.

iv.

Schematics and plumbing diagrams.

After the consult we produce detailed build schematics and plumbing diagrams for a flat fee of $300. These documents show your build dimensions, plumbing layout, sink placement, and countertop specs — everything your county needs to review your application.

The $300 covers the drafting work whether or not you go on to place a build order. It is separate from your build deposit.

v.

You submit to your county.

Take the schematics and submit your health permit application to your county. This step is entirely on you. We do not submit applications and we do not follow up with health departments.

Timelines vary by county and can take weeks to months. We have no way to shorten that and neither does anyone else selling you a cart.

vi.

Approved? Let's build.

Once your county approves your application, let us know and we move forward with your build order. From there it follows the normal path: estimate, project agreement, deposit, production.

If your county requires changes to the design, we review feasibility before proceeding.

Before your consult

Gather these first.

Before booking, please confirm you have gathered the following from your local health department. Every item on this list comes from them, not from us.

  • 01Your county's health permit application, downloaded or requested
  • 02Required NSF certifications for your equipment
  • 03Countertop material requirements for your county
  • 04Sink size and compartment requirements
  • 05Any specific plumbing hookup specs

Good to know

If you have not researched your county's requirements yet, that is ok. The inquiry form walks you through what to gather. Just know that we cannot schedule your consult until you have that information ready.

Scope of work

Where our job ends.

RidgeCraft is a woodworking and fabrication business. We are not permitting consultants, health code specialists, or regulatory advisors. Our role is to build your equipment to your specifications.

What we do

Our role

We can support your process in these limited ways:

  • Provide build schematics and plumbing diagrams upon request ($300)
  • Accommodate specific construction requirements documented by your health department
  • Modify designs to meet stated requirements, provided they are submitted in writing before your order is placed
What we do not do

Your responsibilities

The following are solely the responsibility of the customer. RidgeCraft will not perform, research, or advise on any of the items below:

  • Contacting your local or state health department
  • Researching applicable health codes or equipment standards for your jurisdiction
  • Determining whether a specific build configuration will be approved
  • Submitting applications or documentation to any regulatory agency on your behalf
  • Following up with health departments regarding approval status
  • Making design changes after an order is placed due to permitting requirements — change order fees may apply
Cost and timeline

What it costs, and how long.

Two clocks run here. The county's clock, which we do not control, and the build clock, which starts after you are approved.

Schematic fee
$300 flat, covering drafting of your build schematics and plumbing diagrams. Separate from your build deposit. It covers the design and documentation work regardless of whether you move forward with a build order.
Consult
30 minutes, scheduled after you have your county's requirements in hand.
Permit approval
Depends entirely on your county. Approval can take anywhere from a few weeks to several months.
Build pricing
Once your permit is approved, your build follows standard Signature pricing (from $1,750) or Custom Elite (from $5,000). Your estimate will reflect any permitting-specific specs like NSF-certified equipment or custom plumbing layouts.
Payment
45% deposit, 35% at production, 20% at completion.
Build lead time
Custom Elite builds take 12–16 weeks from deposit. Signature lead times are quoted on your estimate.
Change orders
Design changes made after an order is placed because of permitting requirements may carry a change order fee. Get the requirements in writing before you order and this does not come up.

Not sure you need a permit at all?

If you are not sure whether your business requires a health permit, reach out and we will point you in the right direction. If you do not need permitting, the standard order form is where to start.

"Start the permitting inquiry. It takes about five minutes."

After you submit, you will be directed to schedule your permitting consult, and we will send a confirmation email with the scheduling link in case you need it later. We reach out within one business day.